Fan SFP and FEI are not two labels answering the same question in the same units. Energy assessment of equipment, including EC fans, is not complete from a motor type or catalogue heading. Engineers and buyers need the metric definition, duty point and power boundary. This guide organises comparison data; it does not create an unmeasured product index, approval or saving guarantee. The supplied evidence should show which equipment arrangement and operating conditions a value actually describes.

1. Define the common duty and power boundary first

Match airflow, static or total pressure definition, air conditions and equipment configuration across alternatives. Keep motor nameplate power, fan shaft power and electrical input as separate fields. Do not compare energy indicators without identifying included components and losses. Extreme values from different duties are not equivalent operating performance. If a required input is missing, make it a technical question rather than silently assuming the condition that makes an offer appear more favourable.

Airflow and static pressure selection helps establish the common operating point. A method for building ventilation is not automatically applicable to a specific industrial process duty. State the required assessment method and purpose in the enquiry. Do not fill missing pressure or power inputs with assumptions simply to select the better-looking indicator. Buyers should understand the actual common basis before ranking alternative equipment packages or treating a headline figure as a complete comparison.

2. Explain the SFP numerator, airflow and scope

SFP expresses defined electrical power relative to defined airflow; which powers are combined and which airflow is used belong to the method. An individual fan, a ventilation unit and a wider system do not share an identical boundary. Check units and airflow reference. Adding supply and extract flows without justification is not a valid comparison basis, and a numerical value cannot identify the intended calculation boundary when its definition is omitted from the offer.

Name an internal-component power indicator separately from a value that also includes the external air path. Identify where filters, heat recovery and other components are assessed. A lower value may reflect excluded losses rather than improved equipment performance. Do not declare an SFP category, national requirement or complete-system advantage without matching method and boundary. Specify which documents support the value instead of treating a shortened metric label as sufficient evidence for the whole installation.

3. Connect FEI with a particular fan duty

FEI is a dimensionless energy-performance metric. In the applicable method, reference electrical power for a duty is compared with electrical power for the assessed fan. ISO 12759-6 provides a calculation scope for fan duty points; it does not automatically generate an index for every fan type or point. State applicability and method beside the reported value. A valid quotation needs a clear link between the chosen duty and the equipment configuration being evaluated.

EC and AC fans do not acquire an FEI value from their motor labels alone. Request the data used for the motor, transmission and controller combination. An index from another point or configuration cannot become the result for the model requested. SFP and FEI cannot be ranked on a common numerical scale. A smaller number for one or larger number for the other does not replace checking that the scope, duty and evidence are comparable.

4. Close gaps in the electrical-power chain

Identify whether power was measured at an input boundary, calculated from component data or stated only at the fan shaft. Record how control and transmission losses are treated by the method. Do not add the same loss twice or treat an unspecified loss as zero. Keep the report linked to the equipment and configuration. Where an element is outside the supplied assessment, name it so the buyer can see what remains to be evaluated.

Fan VFD selection helps review the control side of this data chain. Changing the motor or controller does not mean previous power and index values remain valid. Obtain the data needed for the requested combination. A control input does not prove all losses were measured or the quoted package's energy performance was verified. Retain the distinction between a controllable component, a calculated combination and a tested or measured operating result for the actual assembly.

5. Do not turn a point metric into annual consumption

Define hours, part-load duty, control mode and changing pressure separately for annual assessment. SFP or FEI alone does not contain that schedule. Annual energy needs electrical input and duration for the relevant operating states. A ranking at one point may not persist across loads. Do not derive a fixed saving percentage from one catalogue figure or apply a design-point advantage to every hour without checking the operating profile and available input data.

Reduced airflow or a different pressure is not an energy improvement unless the required service is still delivered. Distinguish operating records, calculations and measurements. Explain downtime and auxiliary loads within the chosen boundary. Missing inputs should not appear as assumed conclusions. Record which scenarios were not evaluated and who will provide information, so the comparison remains transparent about its limits rather than promising an annual result unsupported by the actual duty and operation.

6. Request evidence as well as the indicator

The technical catalogue is a starting point. Link model, configuration, duty, electrical-power definition, SFP boundary, FEI method and supporting documents in the same record. An absent indicator is neither zero consumption nor an approval mark. Turn unmatched quotation fields into technical questions. The file should make it possible to compare what each offer includes, which assessment was performed and which inputs still need confirmation before an informed equipment acceptance decision.

At handover, check equipment and settings against the assessed combination. Identify what a site verification actually measured. Review affected calculations after a subsequent motor, control or system change. This preserves the meaning of the indicator without inventing product efficiency, certification or annual savings for the whole operation. It also gives the operator a record of the conditions attached to a result instead of a standalone label that appears to apply indefinitely.

Share the duty point, power definition, available SFP or FEI evidence and operating scenarios with Voltvent to clarify the comparison scope.

Contact Sales

Privacy Preference

Your privacy, your choice.

We use essential browser storage to remember your preferences. Optional external content, including the office map, only loads with your permission.

You can use the website with essential storage only and change your choice at any time under Privacy preferences in the footer. Read our for details.