Heat Recovery Unit Selection: Airflow, Efficiency and Frost Control
Heat recovery unit selection involves more than finding the highest efficiency percentage. Required outdoor airflow, supply and extract duties, climate and control sequences need review together. The quotation should distinguish the heat exchanger’s performance from the operating conditions and energy requirements of the complete unit.
1. Define the two air duties separately
Prepare airflow and pressure inputs for supply and extract separately. State which calculation boundary includes external duct resistance and which includes the internal filter and exchanger losses. Adding the same internal loss to both the external pressure requirement and the unit calculation can produce a selection error.
Establish building pressure balance, operating hours and minimum outdoor air requirements for the project. Do not assume that both airflows must be equal for every space or operating state. Clarify whether the unit is required to provide only ventilation and recovery, or active heating or cooling as well.
2. Compare temperature and moisture performance consistently
Separate sensible heat transfer from moisture transfer. Temperature efficiency is not the same quantity as humidity or total energy performance. A plate exchanger label alone does not establish whether moisture is transferred; permeable membrane arrangements can behave differently. Use the actual technology and the declared performance metric.
Compare candidates at matching airflows, flow ratio, inlet temperatures and humidity conditions. EN 308 addresses performance testing of air-to-air heat recovery components, rather than general approval of the whole unit or building. Recovery components using heat pumps are outside that scope; their capacity and COP data require separate assessment.
3. Check leakage and suitability for the extract air
Separate supply and extract paths inside a unit do not establish zero air transfer under every condition. Request internal and external leakage information, pressure arrangements and transfer or airflow correction data such as EATR/OACF where applicable. Identify the exact model and operating conditions that were tested.
Do not automatically apply comfort ventilation assumptions to greasy, corrosive or hazardous process exhaust. The project team must establish the required separation, material suitability and cleaning conditions. Exchanger type alone does not demonstrate hygiene performance, airtightness or suitability for a particular industrial process.
4. Define frost, condensate and bypass operation
Frost risk depends on more than outdoor temperature; extract temperature and humidity, exchanger arrangement and airflows also matter. Check the model’s control description for the conditions that activate protection and its effect on supply airflow, leaving air temperature and energy requirements rather than using one universal threshold.
Do not assume that preheating, defrosting or another protection method works identically across all products. Include condensate drainage and access requirements in the installation record. Bypass can reduce recovery when it is unnecessary; the control sequence determines its use in favourable outdoor conditions. It does not itself provide active cooling capacity.
5. Keep recovery efficiency and total energy distinct
Fan input power and the annual operating profile are separate parts of the energy assessment. Review both fans, clean and loaded filter conditions, exchanger pressure drop and required auxiliary loads within a consistent boundary. Fan power is not recovered thermal energy or active heating or cooling capacity.
A higher temperature efficiency does not automatically mean lower annual consumption. Climate, operating hours, pressure losses and additional protection or heater loads influence the result. If a heat pump is integrated, define its performance separately; a fan curve cannot establish capacity, COP or the complete unit’s electrical consumption.
6. Complete the quotation and commissioning record
Request the exact model, both air duties, filters, comparable recovery data, leakage test scope, sound, controls and service space. Check the installation orientation, drainage, filter access and protection arrangements in the operating instructions. A general efficiency statement cannot close a gap in the documentation for the offered configuration.
Assess airflow, pressure balance, sensors, bypass and frost protection against project acceptance conditions during commissioning. Hand over maintenance responsibilities and filter checks to the operator. Record design assumptions alongside site measurement conditions, rather than presenting a catalogue test point as the actual performance throughout the year.
Share the supply and extract duty points, climate conditions and control requirements with Voltvent for a project review.